Martens and Associates were engaged to supervise and document the removal of underground storage tanks (USTs) and the remediation of a former service station site at Mosman, NSW.
Martens and Associates were engaged to undertake a broad range of environmental engineering to guide development planning for an ‘eco-tourist’ resort on the island.
Martens were engaged in the geotechnical investigations for a proposed 15 storey mixed-use development, including 1 basement level, at 209 Castlereagh Street, Sydney, NSW.
Martens was engaged to provide engineering services associated with in the North Turramurra Recreation Area stabilisation and golf course development proposal.
Martens were engaged to conduct a detailed geotechnical and hydrogeological investigation for the ‘Great Hall Project’ at Knox Grammar School, Wahroonga, NSW.
Martens carried out a combined geotechnical, acid sulfate soil (ASS) and Stage 1 and 2 contamination assessment to identify potential development constraints for a proposed on-site stormwater treatment device (OSTD).